• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

  • Home
  • Volunteer
    • Volunteer
    • What to expect on a Friends of the Peak work day
  • About
    • Mission
    • Our Board
    • Our Partners
    • History
  • News
  • Trails
    • Trail Etiquette
    • Our Trails
    • Ring the Peak
    • Other Trails
    • Trail Advice
  • Pikes Peak
  • Membership
  • Contact
    • Advocacy

Kevin Shaw

August 13, 2025 by Kevin Shaw

August 2025 News!

Well, you haven’t heard much from us this spring and early summer but that’s because we’ve been so darn busy.
Here’s a brief rundown of what we’ve been doing.
Over the winter we purchased some carbide tools made for stone masons. These are hand tools with extremely hard carbide edges. We had an unofficial workday/training session for crew leaders to practice using these tools on May 12. These tools give us the ability to tackle tougher jobs with rock.
Our first official workday was on Thursday, May 15 on the Seven Bridges Trail. You might’ve seen pictures from that day if you looked at our Facebook page. Even if you don’t have a Facebook account you can see what we’ve been up to at www.Facebook.com/friendsofthepeak
We’ve posted video there too.

The creek was very high, and 6 inches of clear cold water was running over Bridge 1. We didn’t want to spend the whole day in wet shoes so our crew of 6 volunteers took the very easy detour using the Mount Buckhorn Trail. We got back on the Seven Bridges Trail just above Bridge 1. Our task that day was to install some much-needed rock steps above Bridge 2.

The next day, May 16, was our first day working in The Nature Conservancy’s Aiken Canyon Preserve. We fixed lots of rutted trail, installing check dams. We also installed rock steps leading up out of arroyos.

After a rest day we were back to work, this time for our first day on Barr trail, Sunday, May 18. It was a post and rail day, and the four of us worked on finishing up final repairs to the fence damage caused by the 2023 boulder.

On Thursday, May 29 a larger team went up to seven Bridges Trail just above Bridge Seven. It rained and drizzled all day and later the rain became heavier. The heavy rock work that our volunteers did may very well have saved Bridge Seven from further damage when the creek really flooded. That flooding is what undercut and collapsed N. Cheyenne Canyon Rd. and that’s why you couldn’t get to North Cheyenne canyon on the paved road for all of June and half of July. The flooding also did more damage to Bridge One and eroded the banks so that the bridge
no longer reached the banks. Since then, the Forest Service closed the Seven Bridges Trail and it only recently reopened. This of course messed up our calendar and we had to change dates so that we could keep working on our other high priority trails.
But let’s not forget that all that rain also affected Barr trail, and as many of you know, it caused a good size boulder (we call it the 2025 boulder) to slide down into the trail at a place that is commonly called the “tunnel”. This is where Barr trail passes underneath two huge boulders (you can see them on the Google Maps satellite view). We teamed up with our friends from the Pikes Peak Marathon and removed this obstacle on July 6. We got this done in time that it did not cause problems for the Barr Trail Mountain Race on July 20. There’s lots of pictures and
video of this on our Facebook page at
https://www.facebook.com/FriendsofthePeak/videos/1809875143284448 and
https://www.facebook.com/FriendsofthePeak/posts/pfbid02wcozhkH2J57D4QiNAwXP3APkAj4
5EnZ8yDuS4GfkrKUMaNkEo78qqkBoGLj3KiNRl

https://www.facebook.com/share/v/16tfrpDvce/

Another place we worked was where a boulder slid down onto Barr trail in 2013, about a mile and a quarter from the trailhead. Some of the boulder had been removed, but erosion had made the trail more dangerous. It needed durable rock steps. Over three workdays we installed five rocks making the passage much safer, as demonstrated by these hikers in the “after” picture. We accomplished this with the help of 12 great volunteers from Trane Technologies in Pueblo.
  

Moving heavy rocks is one of the hardest parts of our work. It took six volunteers to move this step rock up the trail to where we installed it. Video available at
https://www.facebook.com/share/v/1AdU8BeoGi/


Here one of the Trane volunteers is using a carbide-tipped chisel to adjust the shape of the underlying rock to fit the step rock we would install.


And here’s the Trane team at the end of the day.


Now that the city has reopened Cheyenne canyon, we can finally get to the Saint Mary’s Falls trail. In the next newsletter we’ll update you on our work there.

Well, that’s some of what we did in our first 18 or so workdays this year (I lost count). But don’t
feel left out- There are still 7 public workdays on our 2025 schedule. Come on out and join us
for one!
https://friendsofthepeak.org/volunteerwithus/

Oh, yeah before you go, did you know that King Soopers has a Community Rewards program and you can select Friends Of the Peak as your designated charity?  It’s easy, cost you nothing, and really helps us out. More info here: https://www.kingsoopers.com/i/community/community-rewards

Filed Under: Uncategorized

June 10, 2025 by Kevin Shaw

Just another day in the office

We set out to repair fences on Barr trail Saturday June 7. But first we encountered this lumpy rock that had slid down the hillside, about 0.35 miles from the trail head.

It wasn’t blocking the trail but it narrowed the trail enough that we decided it should be moved. But even with 6 people and 2 rock bars, working in close quarters we couldn’t flip it back out of the way. So we had to smash it up to make it small enough so we could flip it. After we flipped it out of the way, Laura is knocking the last few parts of it off that were projecting into the trail.

The rock is now about half its original size. Then we continued to the spur trail and went to get some fence rails and posts from our storage area along Ruxton creek. The creek was still out of its banks, but clear and refreshingly cold. Everyone pitched in to pull the rails out of the bundle.

Then it was time to lug them up the trail. Here’s Alex and Maddie carrying one of the fence rails along one of the more scenic stretches of the trail.

Finally at the worksite about a mile up from the trailhead, that last picture is Mo and Laura digging a post hole. Unfortunately that rock Laura is standing on is just the exposed part of a huge rock that continued down the hillside, so we couldn’t dig a deep enough hole.

We know how to solve that problem but that will have to wait for another day. Why not sign up for next Barr Trail Post and Rail workday and find out how we do it? Better yet, help us do it! www.friendsofthepeak.org/volunteerwithus. Like I said, just another day in the office…..

Filed Under: Uncategorized

May 25, 2025 by Kevin Shaw

7 Bridges Trail Update #2 (7/22/25)

Bridge #1

There currently is no bridge #1 on the 7 Bridges trail. Please consider bypassing the first bridge by using the Buckhorn-to-Seven Bridges connector trail via the Buckhorn trailhead (There are USFS detour signs at the TH).

For reference, the Buckhorn trailhead is on the right side of Goldcamp Rd about 100′ before the Seven Bridges trailhead, just before the road passes over N Cheyenne Creek. See image below:

Filed Under: Uncategorized

January 11, 2025 by Kevin Shaw

2024 Recap

If you were at our November 9 get together at Sevens Gate Taproom, you got to hear Brian give a summary of our season, with pictures. BTW, all people who volunteered with us for at least one day were invited, as well as donors. If you believe you should have been invited but didn’t get an invitation, we’re sorry, and please let us know.

It was a good season with lots of solid workdays. We did most of our work on our usual favorite trails: Seven Bridges, Saint Mary’s Falls, and Barr Trail. In addition, we worked on some trails we don’t get to frequently: The McReynolds Reservoir Trail high on the south slope of Pikes Peak, in the South Slope Recreation Area, and the Ring the Peak Trail through Putney Gulch and south towards Horsethief Park.

We had several days where we had groups of volunteers from different corporations. Statistics aren’t very interesting, but the one I’ll mention is that we had 86 unique volunteers this season. We really appreciate this broad base of support.

Pictures? You want pictures? Well, here’s a few, but you’re not getting any locations. You’ll have to match the pictures with the location. It’s a contest. Not every location in the list has a picture.

Figure A

Figure B

Figure C

Figure D

Submit your entries to registration@friendsofthepeak.org    Everyone who matches them correctly gets an extra slice of watermelon at their next volunteer workday.

______ McReynolds Reservoir in the South Slope Recreation Area

______ Seven Bridges, above Undine Falls

______ Saint Mary’s Falls, at one of the sets of log stairs

______ Saint Mary’s Falls, at the path down to the creek about 1 mile from the TH

______ Barr Trail, where the 2023 boulder came tumbling through

______ Ring the Peak Trail in Putney Gulch

In January we will have our annual retreat where the board members sketch out our plans for the 2025 season. One thing we’ve been considering is whether we should purchase some [expensive] masonry tools so we can cut and shape rocks to serve a specific purpose. This will allow us to do some precision rock construction. [Think “building a medieval cathedral” which of course we will do in the off-season for practice.]

If, If, If, you’re interested in volunteering on such a rock work project, please let us know by replying to or BrianV@friendsofthepeak.org  And of course you could (but don’t have to) make a donation for masonry tools as described above.

Filed Under: Uncategorized

August 28, 2024 by Kevin Shaw

Barr trail trip-n-slip days

Come out on September 7, 14 or 19 and help us remove hazards from Barr Trail before the Pikes Peak Ascent and Marathon! Click the volunteer button to sign up!

Filed Under: Uncategorized

April 9, 2024 by Kevin Shaw

What to expect on a Friends of the Peak work day

The first step is registration. 

Pick a date and a project that interests you. Then register for that day on our website, www.friendsofthepeak.org/volunteer . Registration is required for all our workdays. It gives us a way to keep in contact with you. It also gives the project leader an of idea how much we might accomplish on the work day, and how many tools to bring to the trail head. A few days before the workday we will send you the details of the meeting place and information about what to bring to the workday.

Age Requirements
We love workers of all ages however our children 14 and 15 need to be accompanied by a responsible adult a signed parental waiver, children 16-18 can work with a signed parental waiver.

Meeting details, logistics, and practical stuff:

Most of our workdays are on the Seven Bridges Trail (7BT), Saint Mary’s Falls Trail (SMF), and Barr Trail. On 7BT and SMF days we meet at the paved parking lot at the top of Cheyenne Mountain Boulevard where it intersects Gold Camp Road. We unlock the gate and drive through to the trail heads, saving us a 1.25 mile hike to the SMF trailhead or a 0.75 mile hike to the 7BT trailhead. When we work on Barr Trail, the city of Manitou Springs allows us to park for free while we are working. We will provide you with a dated parking pass that you will need to display on your dashboard. Sometimes parking will be in one of the parking lots downtown, and you can take the free shuttle bus to the cog railroad stop, or we might arrange a carpool. Other times we may be able to park right at the trailhead. When we work at other locations there will be different procedures.

Before we start work: introductions, instructions and a safety briefing.

Once everyone has arrived, the project leader will describe the scope of the work and the goals for the day. There will be a safety briefing that includes general outdoor safety, any specific hazards known to exist, and instructions about safe usage, carrying and storing of the tools. Then you’ll hear about what to do if there is an accident, first aid, and evacuation procedures.Then it’s time to grab the tools and hike to the worksite.

What is the work like? 

Sometimes it’s strenuous (digging with a pick mattock or steel rock bar, carrying rocks that require multiple people to lift, carrying lumber.) Other tasks are easier (replacing fence posts and rails, cutting back encroaching vegetation, building small rock walls, raking, shoveling, and tamping.) No volunteer is ever expected to do any task that they think will injure them. We take frequent water and rest breaks, and a lunch break. 

Finishing up:

We stop work, do a tool inventory, and hike back to the trailhead. We will have cold soft drinks, light snacks, and watermelon. (Watermelon is a tradition!)

Now for some pictures. 1., some of the tools; 2., instructions and safety briefing; 3., some of the places we work. 7BT, SMF, Barr.

Filed Under: Uncategorized

  • « Go to Previous Page
  • Page 1
  • Page 2
  • Page 3
  • Go to Next Page »

Primary Sidebar

Recent Posts

  • 2026 Recap, Part 1
  • Volunteer project day shirts are back!
  • May 2026 News!
  • Fall Aiken Canyon Trail Day
  • FOTP 2025 Volunteer of the Year
  • King Soopers Community Rewards Program
  • August 2025 News!
  • Just another day in the office
  • 7 Bridges Trail Update #2 (7/22/25)
  • 2024 Recap

DONATE

Donations help make it possible to do the work that we need to do on the trails at Pikes Peak.

Footer

Friends of The Peak (FOTP) is a non-profit 501(c)(3) all-volunteer organization

Established in 1995

Friends of the Peak
P.O.Box 2494

Colorado Springs, CO 80901-2494

Follow Us

  • Home
  • Volunteer
  • About
  • News
  • Trails
  • Pikes Peak
  • Membership
  • Contact

Copyright Friends of the Peak | 1995-2025